← Back to Course
Installation and Maintenance
🔧 Installation and Maintenance Guide
📋 Installation Steps:
- Assemble components in weatherproof enclosure
- Mount solar panel facing North (Southern Hemisphere) or South (Northern)
- Set panel angle equal to your latitude
- Install sensor at crop root depth (10-15cm)
- Test system for 24 hours before deploying
📊 Maintenance Schedule:
| Task | Frequency | Notes |
|---|---|---|
| Clean solar panel | Monthly | Dust reduces output 20-30% |
| Check battery voltage | Weekly | Should be 3.7-4.2V |
| Inspect enclosure seals | 3 months | Prevent water damage |
| Recalibrate sensors | 6 months | Drift over time |
| Replace battery | 2-3 years | Or when capacity drops |
🎉 Congratulations!
You now know how to build complete solar-powered IoT systems for African farms. With proper energy management, your sensors can run for years without maintenance!
💡 Key Takeaways:
- Apply these concepts directly to your farm or project.
- Take notes on important details for the quiz.
- Use the button below to track your progress.
×