OC
OceanRemote
Low-code IoT platform
← Back to Course

Installation and Maintenance

🔧 Installation and Maintenance Guide

📋 Installation Steps:

  1. Assemble components in weatherproof enclosure
  2. Mount solar panel facing North (Southern Hemisphere) or South (Northern)
  3. Set panel angle equal to your latitude
  4. Install sensor at crop root depth (10-15cm)
  5. Test system for 24 hours before deploying

📊 Maintenance Schedule:

TaskFrequencyNotes
Clean solar panelMonthlyDust reduces output 20-30%
Check battery voltageWeeklyShould be 3.7-4.2V
Inspect enclosure seals3 monthsPrevent water damage
Recalibrate sensors6 monthsDrift over time
Replace battery2-3 yearsOr when capacity drops
🎉 Congratulations!

You now know how to build complete solar-powered IoT systems for African farms. With proper energy management, your sensors can run for years without maintenance!

💡 Key Takeaways:
  • Apply these concepts directly to your farm or project.
  • Take notes on important details for the quiz.
  • Use the button below to track your progress.